Renovation Project
1: New Battery – done
2: Fix Air conditioning – on going
3: Synthetic blend oil change – done at 96,304 miloes
4: brake booster – checking
5: power steering – checking
6: coolant – checking
7: brake fluid – checking
8: washer fluid – checking
9: belt conditioner – checking
10: Maquires black trim conditioner – purchased
11: wash and detail – done
12: brake clean – purchased
13: Maquires scratch remover – purchased
14: Maquires spray wax – purchased
15: new clock – installed
16: Rain X – ongoing
17: